Petroleum Authority of Uganda- Page 3

LEFT-RIGHT: David Kasingwire (Daks Couriers), Isaac Nsereko (RI Distributors & DT Logistics) and Harold.B.Ssemalwadde (Globe Trotters Ltd) in Mombasa during the offloading of the CNOOC Uganda oil rig.PHOTO/Courtesy

Inside the operation to move CNOOC’s massive oil rig from Mombasa to Kikuube and the 4 Ugandan friends whose company, DDG Oil & Gas Logistics, pulled off this complex task

On the 26th of September 2022, a new milestone was achieved in Uganda’s oil and gas industry. The first set of the Drilog and Welleader system and the LR8001 land rig equipment
October 18, 2022
The Permanent Secretary/Secretary to the Treasury Goobi (Front second Left) on a guided tour of the ongoing works at Kingfisher well project

Critical Oil And Gas Infrastructure Almost Complete – PS/ST

As Uganda gears up to become a regional oil producing economy, works on the critical oil and gas infrastructure have progressed significantly. This observation was made by Dr. Ramathan Ggoobi, the Permanent
April 13, 2022

 

error: Content is protected !!