Floating Islands at Kiira/Nalubaale dams

Nalubaale Dam
A Ministry of Agriculture long-arm excavator aboard a barge excavates part of the third island that was diverted from a direct collision with the dams to 'dock' at Jinja pier

Eskom shuts down Nalubaale Dam as operations to fully restore Kiira Dam and remove third floating island get underway

Eskom Uganda Limited, the company running Jinja’s Nalubaale Hydro Power Dam (180MW) and Kiira Hydro Power Dam (200MW), has confirmed that it has totally shut down the Nalubaale Dam to pave way
April 21, 2020

 

error: Content is protected !!